Review and provide comments on Compilation and maintenance of Network Operations plan.
Liaise with Client on approvals process.
Liaise with Contractor and Independent Safety Assessor on submittals review and approval.
Responsible for the modelling and timetable assessment activity
Modelling and simulation process are to be monitored to support the development of analysis in certain phase.
Effectively use of RailPlan tool for performance modelling , or similar software package
Effectively use ATTUne for timetable modelling. or similar software package
Identify and address conflicts on the network for the provisioning of passing loops and double tracking.
Manage both tools (RailPlan & ATTUne) simultaneously for rapid iteration during feasibility development stages.
Able to understand combination of both tools which will differ in each difference phase of the rail project i.e.
Preliminary run times and energy use
Updated alignment and rolling stock.
Further modelling update to reflect updated inputs e.g. Track alignment or rolling stock changes.
Performance modelling would be undertaken to further support the infrastructure development.
Further Railplan analyses validating the ATTune timetable construct for signaling constraints and level crossing etc. undertaken to support updated design.