| Job Location | Jizan, Saudi Arabia |
| Education | Not Mentioned |
| Salary | Not Mentioned |
| Industry | Heavy Industry & Metallurgy |
| Functional Area | Not Mentioned |
PurposeThe Jazan Integrated Gasification & Power Company (JV) is a 3 partner, $12bn JV that is closely integrated with a 400 000 barrel per day crude refinery.˙˙The refinery will supply up to 100000 barrels per day vacuum bottoms from its crude distillation unit to 15 Shell Gasifiers in the JV. The gasifiers will feed 4 Acid gas removal (AGR) trains where after the gas will split to feed 2 Hydrogen Recovery Units that will produce hydrogen for the refinery while the rest of the syngas will go to 10 gas turbines that together with 5 heat recovery steam generator and 5 stream turbines will produce 33000 ton of steam and 4000MW of power daily. Oxygen (22000 ton per day) and nitrogen (60000 ton per day) will be manufactured in 6 ASU?s. The JV will also have the associated utilities, inclusive of desalination, water treatment, wastewater treatment, fuel gas, plant and instrument air and the main electrical substation.Nature and ScopeI&C commissioning engineer will have enough work experience in the field of control and I&C mainly control system DCS - T3000 and TXP hardware & software engineering, installation & commissioning for the Energy sector - CCPP, power plants.˙Principal Accountabilities (Operations)˙
Keyskills :
© 2023 HireeJobsGulf All Rights Reserved