hireejobsgulf

Mechanical Engineer

1.00 to 10.00 Years   Dubai, United Arab Emirates   04 Jan, 2024
Job LocationDubai, United Arab Emirates
EducationNot Mentioned
SalaryNot Mentioned
IndustryConstruction & Building
Functional AreaNot Mentioned

Job Description

. Complete Plumbing and drainage engineering knowledge for the project executionúÿÿÿÿÿÿAir Conditioning Cooling Load calculations, Heat Loss calculations following ASHRAE codes.úÿÿÿÿÿÿGet approved HVAC Shop Drawings, - -coordination drawings, Work method statement and project specification from project engineer.úÿÿÿÿÿÿDuct system design, supervision, duct fabrication and installation of the ductwork following SMACNA 2, DW 144 codes.úÿÿÿÿÿÿChilled water pipe design and pump head calculation, selection of chilled water pumps.úÿÿÿÿÿÿCalculation of static pressure of Blowers & Pumps and their selection.úÿÿÿÿÿÿSelection of Chillers, AHU?S, FCU?S, Exhaust Fan, Blower and other Accessories.úÿÿÿÿÿÿEnsure the HVAC Ducts, Fittings, accessories and Child water pipes, fittings, accessories are available and approved by Inspection department prior to installation.úÿÿÿÿÿÿSite supervision of all Air-conditioning & works.úÿÿÿÿÿÿPreparing relevant documents to conduct inspection for completed installation activities and raise RFI to QC-Inspector (To ensure that any activity offered for inspection has an attachment of IFC drawing, method statement (if required), Inspection & Test Plan (ITP) followed by check list).úÿÿÿÿÿÿClosely monitor site activities to ensure quality of work is in compliance with approved shop drawings and specifications and get daily progress report from site supervisor and update the project EngineerúÿÿÿÿÿÿActive involvement in weekly meeting with the project management & QC Supervisor and manager to resolve site related issues.úÿÿÿÿÿÿPreparing the relevant documents to Conduct Testing inspection such as Duct light testing for ducts and Hydro test for above ground and underground chilled water piping systems.úÿÿÿÿÿÿEnsure safe work environments, control the use of material and avoid damages and waste, request material, tools and equipment needed for the projects and issue the foreman daily instructions as per the work planúÿÿÿÿÿÿMaintaining records and archives to company standardsúÿÿÿÿÿResponsible for Preparation of Bill of Quantity of Materials for Projects.

Keyskills :

APPLY NOW

Related Jobs

© 2023 HireeJobsGulf All Rights Reserved