| Job Location | Dubai, United Arab Emirates |
| Education | Not Mentioned |
| Salary | Not Mentioned |
| Industry | Management Consulting |
| Functional Area | Not Mentioned |
CIVIL SUPERVISOR (ENGLISH AND FRENCH LANGUAGE)Civil Supervisor Location : France Tavaux (France) Project : Spritz Project Reports to: Construction Director / Area superintendent Field safety responsibilities - Implementing HSE procedures and standards in compliance with applicable laws, Health and Safety Documentation and Environmental Management Manual. - Verifying that suppliers work in a safety manner. - Be diligent in correcting unsafe acts, unsafe behaviors and unsafe conditions. - Through the Subcontractors field supervisors/foreman to ensure team members are trained for their duties as per the Project safety requirements and Subcontractors employees are actively involved in the project safety program. - Hold regular safety meetings with Subcontractor discipline supervisors. - Make sure that work permits are obtained before start any related activity and to ensure compliance to permit conditions. - Conduct evaluations of works scope, area condition and specific equipment inspections prior starting field activities and to ensure that hazards and abatement measures are communicated to Subcontractor field supervisors. - Make sure Subcontractors observe project safety policies and procedures and oblige them to eliminate any dangerous situation or any non-compliant equipment/tool. - Be diligent in reporting to the appropriate level of Construction Supervision and to Subcontractor management all unsafe acts, unsafe behaviors and unsafe conditions. - Being responsible for the highest standards in housekeeping for assigned area, to make safety walks minimum once a day to verify the area housekeeping and to promptly inform Safety Superintendent/supervisor about unsafe work procedures. - Participate in area safety assessment. - Participate in Subcontractor toolbox sessions and monitor crew attendance. - Assist in incident investigations. Common Field job responsibilities - Maintain close liaison with other discipline supervisors working in the area in order to coordinate all classes or work in the area; - Make sure that materials used are in accordance with project technical documents and applicable codes and specifications. - Check the efficient productivity of Subcontractors labour with regards to the quality and quantity (jointly with project control). - Monitor Subcontractor execution of the work in order to maintain the program. - Assure that all works are carried out on schedule, otherwise check deficiency and refer to Field Superintendent/Construction Manager, in order to promptly define and implement corrective actions that permit to comply with the schedule. - Verify and discuss with Field Superintendent/Construction Manager and Field Project Engineer eventual modification or any difference raised on the activity relevant to previous and following points and cooperate with them to issue Sketches Layout (SKL) for the relevant modification, when works must be executed in different way as indicated on drawings.(If cost or schedule impacts arise, it is mandatory to get approval from Construction Manager). - Record any modification after approval and in cooperation with Construction Manager inform the Subcontract Administrator if involving contractual changing. - Prepare and fill the Request of Work Execution (R.W.E.) form for any extra work out of contract or for modification, for further approval by other functions, before the execution of the work itself, as per procedure by Subcontracting Department. - Make sure Subcontractors observe safety procedures and job site activity regulations and oblige them to eliminate any dangerous situation. Make safety walks minimum once a day to keep Safety Superintendent informed about unsafe work procedures. - Make sure that Work Permits are obtained before start any work when required. - Check that Subcontractor is working on the base of last edition of all drawings and other technical documents (jointly with QA/QC leader). - Check by the Manpower presence report the quantity of Subcontractors manpower present in site (jointly with Subcontracting Manager). - Check, sign and collect all Subcontractor Time Sheets when the work is reimbursed on hourly basis. - Prepare/check Subcontractors monthly/weekly progress of work and transmit relevant data to Project Control. - Check the execution of the works, which must be in accordance with technical documentation, CLIENT & Subcontractor Quality Plan, work progress, applicable codes and rules, authorizing consequently the activity of accounting for the installed quantities. Take action to correct any deficiency. - Fill the daily log record book. - Ensure in advance that no hold up of Subcontractor work can occur due to lack of needed engineering documents and materials, or work area accessibility. This to avoid Subcontractor claims (jointly with Project Control and Field Engineer). - Provide/Check for accounting. - Prepare, issue to Subcontractor, and file Construction and Final Punch Lists, and follow up the completion of relevant outstanding works. - Organize his work-file according to procedure and, in case of substitution, inform the new supervisor about the works state of the art and transfer him the work-file. Field job responsibilities - Make sure that Subcontractor material stocks are sufficient to keep up with works schedule. - Check Subcontractor field surveying, establish with Subcontractor reference bench marks for elevation and alignment as per scope of works request and check their correct execution (including topographical calculations) and send a check advise in time to the Client. - Check proper execution of the Subcontractor work and check any part for concrete construction preparation before concrete is poured and record it. - Check and approve alignment and elevation of foundations, and type and position of anchor bolts, plates and templates and record it. - Check/review Subcontractor bar bending schedule and approve for construction and accounting. - Make sure that materials used are in accordance with project technical documents and applicable codes and specifications. - Check the efficient productivity of Subcontractors labour with regards to the quality and quantity. - Check material quality and provide that all field tests are made according to project technical documents and applicable codes and specifications. Maintain record of all tests. Extent of testing shall be as foreseen in contractual project specifications. - Identify possible Non Conformities according to the Quality Assurance System Procedure both for System and on Contract. - Suggest the Corrective Action according to the Quality Assurance System Procedure both for System and on Contract. - Monitor Subcontractor execution of the work in order to maintain the program. - Assure that all works are carried out on schedule, otherwise check deficiency and refer to Field Superintendent/Construction Manager, in order to promptly define and implement corrective actions that permit to comply with the schedule. - Verify and discuss with Field Superintendent/Construction Manager and Field Project Engineer eventual modification or any difference raised on the activity relevant to previous and following points and cooperate with them to issue Sketches Layout (SKL) for the relevant modification, when works must be executed in different way as indicated on drawings. (If cost or schedule impacts arise, it is mandatory to get approval from Construction Manager). - Record any modification after approval and in cooperation with Field Superintendent/Construction Manager inform the Subcontract Administrator if involving contractual changing. Language of the Project is English. However knowledge of French language is required.
Keyskills :
© 2023 HireeJobsGulf All Rights Reserved