| Job Location | Cairo, Egypt |
| Education | Not Mentioned |
| Salary | Not Mentioned |
| Industry | Telecommunications |
| Functional Area | Not Mentioned |
1) AC/DC load calculations , Battery sizing and AC/DC single line diagram.2) CT/VT sizing calculations.3) Low voltage power cables sizing calculation.4) Metering & Protection single line diagram.5) Detail design of all substation panels (local , remote , protection &common).6) Cables design of all substation panels (local , remote , protection &common).7) Interface between different suppliers with different drawings.8) Design review for supplier drawings.9) All the a/m functions for different voltage levels 500,220 & 66kv (GIS & AIS).