To be fully aware of the project mechanical specifications, drawings, and BOQ.
Give the foreman daily instructions as per the work plan.
Ensure that all mechanical factory activities are conducted under controlled conditions as per shop drawings, method statements, specifications, and work plans.
Assist the technical office engineer in the preparation of method statements related to mechanical works.
Report to the senior mechanical engineer for any technical problem or inquiries in the project.
Request material, tools, and equipment needed from the senior mechanical engineer before seven days if possible.
Control the use of the material and avoid damages and waste.
Ensure quality, health, and safety procedures are followed.