Review of existing pre-FEED documentation related to control system integration and trip propagation prevention system across the IGCC.
Revise and improve existing pre-FEED documentation to ensure basis is sound.
Develop pre-FEED documentation to PFD (Process Flow Diagram) level.
Develop conceptual and functional design specification of the solution to meet the desired objectives of the system.
Identify critical dependencies to enable successful deployment of proposed solutions.
Identify and facilitate specification of long lead items for the project.
Understand Contractor obligations between customer and client.
Work Scope to be delivered:
Prepare for issue the Pre-feasibility studies through development of these studies and functional design activities related to the project.
Followed by delivery of the Feasibility studies to support the Lifecycle Process of the Project.
Support the progress for the Baseline Pre-Requisite scope including loop tuning and configuration.
IRT & LRT Readiness scope delivery including predictive trip system simulations, identification and selection of field hardware redundancy / additions and inter unit / block PID cascade controls.
Main Project Front End Loading (FEL) stage engineering package development including input to resource, schedule and cost requirements.
Development of plant train process controls with power generation.
Close interaction and design developments with OEM Subject Matter Experts and hardware suppliers.